Sewage Treatment Plant
Pre-bid engineering and cost estimates for a 220 MLD HAM-mode STP with full process, MEP, and SCADA design for Meerut.
Pre-bid Engineering cum estimation services for 220 MLD Sewage Treatment Plant & associated infrastructure development project under Hybrid Annuity Mode (HAM) based PPP Model. Comprehensive engineering design covering process, hydraulics, mechanical systems, electrical & instrumentation, and SCADA integration. Project includes detailed cost estimation, BOQ preparation, and technical specifications for construction bidding. Designed to serve Meerut's growing urban population with sustainable wastewater treatment solutions meeting environmental compliance standards.